The performance of a lift station is established long before it is an concrete structure complete with pumps, piping and valves. The final design of a lift station is influenced by a variety of variables that include the flow calculation, the elevations of the site, pressures in the system, wastewater characteristics, peak times accessibility to maintenance, control systems, and the future capacity.

When comparing lift station designers for a specific project It’s not only about who can specify pumps. The question is not who can specify pumps instead, but who is able to translate the operating requirements and site conditions into a system that is practical to construct and maintain.

Image credit: romtecutilities.com

Gravity is not without limits

Gravity is typically the simplest method of moving wastewater. But, the terrain and the building patterns can make it difficult. It is possible that the new residential, industrial or commercial properties are too large, far away or located in regions where gravity sewer extension is not feasible.

The lift station is the mechanism that carries the wastewater to the next point of collection. However, designing one requires understanding the operation of a typical system and less ideal circumstances like a high flow or maintenance of pumps breakdowns in equipment, or future increases in demands.

Companies considered among the best wastewater designers should therefore evaluate the entire conveyance problem rather than treating the station as an isolated piece of equipment.

Existing infrastructure makes the problem more complicated

Construction isn’t always the only issue. Many municipalities must modernize or replace their old facilities to ensure that the essential wastewater infrastructure functional.

Wet wells that are in use, force mains, electric services, controls, boundary lines for the site, as well as downstream infrastructure can limit the design. Engineers must determine which components can be reused and what needs to be replaced as well as how the new elements will be integrated into the existing system.

Romtec Utilities has experience in commercial, commercial, and private applications as well as retrofit and replacement projects. This permits pumping systems be tailored to the ownership and operational needs of each project.

Stormwater is subject to different rules

The top stromwater system engineers using the terms used in the search need to resolve a specific hydraulic issue. Stormwater systems can experience dramatic fluctuations in volume based on the rainfall, drainage area capacity of detention, as well as allowable discharge rates.

A station, for instance, which serves as a detention zone may need to temporarily hold the runoff for a while before pumping it out at a specific speed. Engineers should take into consideration the head and flow conditions, environmental needs and objectives for flood management, and the specifics of the drainage system for receiving.

Prefabrication can move work away from the worksite

Field assembly is a difficult process that can cause confusion in scheduling, errors delays, reversals, and even changes orders. Romtec Utilities prefabricates equipment before it is delivered to project sites.

The process of completing more assembly and quality control work in a controlled setting can reduce the amount of construction required in the field. Based on Romtec’s approach to project management Certain installations that would otherwise take weeks could be completed in a matter of days, based on the requirements of the project.

Our commitment to engineering success extends to commissioning

The assembly of all the components doesn’t make a station stable. Romtec Utilities is an installation advisor, and will be there to guide the construction process from start-up, through control panel checking, pump operation testing the system, and also personnel training. The documents also provide information that the operators could refer to when they are maintaining the system, or thinking about future expansion.

For owners searching for the most reputable lift station designers, that final step deserves consideration. A good engineer should be able to produce more than a decent set of sketches. It should provide the owner with a functional system that is well-trained, with a competent staff, valuable documentation, and equipment designed to meet the demands the station will encounter in its daily operations.